Minister
Ministry of Industry and Natural Resources of the Astrakhan Region
Chief Engineer - First Deputy General Director
Gazprom Pererabotka
Deputy General Director for Prospective Development
Gazprom Pererabotka
Director
Astrakhan Gas Processing Plant, branch of Gazprom Pererabotka
Director
Astrakhan Oil and Gas Company
General Director
Gazpromneft Terminal
Corporate Finance Director
Slavyansk Eco
Deputy Head
Nizhne-Volzhskoe Department of Rostekhnadzor
Head of the Hydrocarbon Processing Department
EuroChem
Project Leader
Caspian Innovation Company
Chief Engineer
Stavrolen (LUKOIL)
Chief Technologist
Novokuibyshevsk Refinery (Rosneft)
150+ participants – commercial and technical top managers of flagship O&G processing and petrochemical facilities from Russia, the Baltic states, and the CIS as well as regulators, technical and engineering companies
Investment: showcase of 25+ largest investment projects for construction and modernisation of O&G and petrochemical capacities expected in 2022-2030 in Russia and the CIS
NEW – Petrochemical sector in Russia and the CIS: overview of new Russian O&G and petrochemical projects, refining by-products as feedstock for petrochemicals, marginality of petrochemical exports
Innovations on Russian and foreign O&G markets: trends in O&G innovations, showcase of new equipment and high-end solutions, case-studies of effective technological integration
Roundtable discussion with CTOs: quality of feedstock and processing
TOP OF THE AGENDA! Decarbonisation of O&G industry: projects’ economics, strategies, impact of global decarbonisation on the industry and introduction of cross-border carbon regulation
Logistics, design, and management. Digital transformation of the industry: application of IT in O&G processing and logistics, construction, and improvement of O&G transportation facilities
Oils and lubricants: new standards, anticipated growth and future of the market
HSE: comprehensive improvement of facility’s security system
30+ hours of business and informal networking! B2B meetings, business lunches, coffee breaks, cocktail reception, and a lot more
ONSITE VISIT TO ASTRAKHAN GPP, Gazprom pererabotka’s facility
The delegates will be able to see the ongoing phase of plant’s modernisation, which will lead to the increase of gasoline and diesel fuel production by about 20%
Astrakhan GPP is one of the largest producers of sulphur gas in Russia, located on the territory of the Astrakhan gas condensate field. Key activities: processing of gas and gas condensate, production of commercial goods, stabilisation of gas condensate, purification of associated water before injecting into underground formations.
To date, the company is developing a modernisation project involving a whole range of measures. Investment projects planned for implementation include:
• Additional capacities of "dry" sulphur granulation, including modern mechanised loading complexes
Project goal is the construction of additional capacities for "dry" granulation of sulphur and a mechanised complex for loading sulphur into rail and road transport
• Reconstruction of power supply, water supply and sewerage facilities
The project is aimed at the upgrading of the entire water management system of the plant, the use of modern water and wastewater purification and disinfection methods, the reuse of treated wastewater in industrial water supply systems. Reconstruction of power supply facilities to ensure round-the-clock full-functional operation of the power supply system
• Reconstruction of key technological facilities of Astrakhan GPP
The project has the goal to re-equip and reconstruct obsolete technologies/technical units, structures, physically worn-out equipment, automation and control instrumentation, power supply systems, pumping and compressor equipment, buildings, technological units and introduce new equipment. This will allow to increase gasoline and diesel fuel production up to 25%
• Reconstruction of Astrakhan GPP’s technological installations
The purpose of the project is to replace obsolete and physically worn-out equipment, to bring it up to modern regulatory requirements to prevent shutdowns and emergencies at the operating production facilities of Astrakhan GPP
*The number of passes for the Visit is limited, please contact the Organisers to learn mo